SEPT 2021 - strip and re-cover buungalow roof with replacement concrete tiles - Necton
AUG 2021 - barn conversions with Cedral clad rear extension - Swaffham
JAN 2021 - strip and re-cover, listed building apex roof with bespoke hip tiles.
Jan 2021 - strip and re-cover
JAN 2021 - lead capping to re-tiled roof peak, bespoke hip tiles.
PROJECTS IN PROGRESS 2020
NOV 2020 - plots 1 and 2 under construction at Lenwade.
NOV 2020- works to eight local estate houses, fascias, guttering eaves repairs and some complete re-roof works.
September 2020 - strip and re-slate - front elevation view, Sunny Hunny, Norfolk.
September 2020 - scaffold up for some roof repairs on a listed property - North Norfolk
September 2020 - plot 1 and 2 under construction - Lenwade, Norfolk.
September 2020 - plot 3,4 and 5 under construction - Lenwade, Norfolk
August 2020 - scaffold up for chimney repairs and flue liner installation - Mid Norfok.
September 2020 - Lenwade, Norfolk, plot 8 & 9 FOR SALE
Feb 2020 - Whitsands Road, plot 6 & 7 completed, plot 8 being second fixed.
PROJECTS IN PROGRESS 2019
Nov 2019- Whitsands Road - plots 1,2,3,4 & 5 all finished and all rented our for our clients, plot 6 nearly ready for decoration, plot 7 and 8, 2nd fixing shortly.
Nov 2019 - Lenwade - plot 8 & 9 with external UPVC installed and ready for the external K-Rend finish on plot 9.
Sept 2019 - replacement Oak balcony with glass balustrading.
Aug 2019 - Lenwade, Street Works complete, groundorks progressing well.
July 2019 - Rear elevation garden room with corner support and window. French doors will open onto terrace and hot tub area!
Plot 1 and 2 handed over today and ready for rental. - June2019
June 2019 - groundworks under way on Lenwade development.
June 2019- scaffold erected in local town ready for redcoration and repairs.
March 2019 - replacement shop front being manufactured in local precinct - temporary boarding in place.
March 2019 - site peperation under way - development
Norfolk
March 2019 - front canopy to match client's car port - Swaffham
Feb 2019 - plot 1,2 (brick facade), 3 and 4 (render facade) rear view - Swaffham.
Scaffold up on plots 5+6.
Feb 2019 - plot 7+8 Swaffham, render under way
PROJECTS IN PROGRESS 2018
Nov 2018 - Concrete and drainage repairs, Dereham Nelson Place shopping centre.
Nov 2018 - plot 7+8 under construction
Nov 2018 - plot 3+4 all roofed, lock and key, scaffold adapted and ready for the K Rend.
Oct 2018 - replacement glazing, lead detail, replacement reclaimed ridge and swallow inserts.
Sept. 2018 plot 1+2 under lock and key, with 3+4 well under way.
Aug 2018 - Chaelt refurbishment with walls demolished, made good, new kitchen, bathroom, cloakroom, electrics and plumbing.
Aug 2018 - 1+2 being covered in, 3+4 ready for scaffolding.
July 2018 - plot 1+2 under construction, Swaffham.
June 2018 - Scaffoldup in Kings Lynn for repairs to joinery, replacement windows and external redecoration.
June 2018 - Flats in Norwich completed and already rented out by the client.
June 2018 - new development, Swaffham, Norfolk.
First dwellings laoded out and ready to lay some bricks.
April 2018 - Bungalow refurbishment and extension - Swaffham.
Mar 2018- Wc refurbishment & disabled facilities - Melre Boddy Centre, Swaffham,Norfolk.
Mar 2018 - front elevation showing infill flats - Norwich, Norfolk
Feb 2018 - nice overhead shot of the groundworks in Swaffham
Jan 2018 - flats, Norwich, Norfolk
Jan 2018 - setting up site New Dwellings, Swaffham, Norfolk.
New Development - Swaffham, Norfolk.
Jan 2018 - front elevation on dispplay with lighting, decorators on site
PROJECTS IN PROGRESS 2017
Dec 2017 - front elevation new build - Norfolk
Dec 2017 - internal view lantern in Orangery attached to new build house - Norfolk.
Dec 2017 -infill site to provide two flats - Norwich, Norfolk.
Oct 2017 - rear scaffold down from Orangey, time for the frames and glass to be fitted.
Oct 2017 - Bespoke glazed lantern installed on Orangery to rear elevation new build - Norfolk.
Oct 2017- external works under way, plastering finished and internal fixtures and fittings going in. Air Source Heat Pump up and running.
Sept 2017 - Valley repairs/replacement - Necton, Norfolk
Sept 2017 - groundworks complete, ready for construction of two flats - Norwich, Norfolk.
Aug 2017 - new build, scaffollding down, plastering underway - Norfolk
Aug 2017 - garage conversion and rear extension, all to Building Regulation approval and inspections - Necton, Norfolk
Aug 2017 - Village Hall WC refurbishment with disabled facilities. - Norfolk
June 2017 - joists and decking fitted to first floor, scaffold up and cavity walling being constructed - Sporle, Norfolk.
June 2017- replacement rendering, with movement joints, decoration and redecoration works - Necton