News

Follow us on Facebook. (see the link in the News page)

 

and Twitter.

 

You can find the latest information on our company and more news from the construction industry here.

 

News and Projects in Progress

SOCIAL MEDIA

Like us on Facebook - click below

And follow us on Twitter

NEWS

FESTIVE PERIOD 2023-24

We will be shut for the Festive and New Year period from the 22nd Dec 2023 until the 8th Jan 2024 inclusive.

PROJECTS IN PROGRESS 2023

Oct 2023 - site strip and footings for two bungalows - Swaffham, Norfolk.

Sept 2023 - new site for two bungalows - Swaffham, Norfolk. ....commencing soon.

Sept 2023 - Phase 1 - first floor extension, phase 2 - side extension  - Little Dunham, Norfolk.

Aug 2023 - garage and utility room extension with materials to closely match the original  - Norfolk.

July 2023 - development in Swaffham, Norfolk - completed

Mar 2023 - plot 2 ready for handover, cleaned, NHBC and Building Control inspections complete.

2023- Welfare unit onto another project.

2023 - New Build

2023- extension to Listed Property

2023 - Bespoke roof lantern during Listed Building re-roof project.

2022 - Art Studio and garage

Mar 2022 - groundworks complete for another project

Feb 2022 - Plot 2 under construction (rendered facade)

Jan 2022 - Plot 1 front elevation - Swaffham

PROJECTS IN PROGRESS 2021

NOV 2021 - plot 1 underway Swaffham

OCT 2021 - gable end flintwork rebuild after partial collapse - Swaffham.

SEPT 2021 - rear elevation garden room extension - Necton.

SEPT 2021- groundworks for 3 plots in Swaffham.

SEPT 2021 - strip and re-cover buungalow roof with replacement concrete tiles - Necton

AUG 2021 - barn conversions with Cedral clad rear extension - Swaffham

 

 

JAN 2021 - strip and re-cover, listed building apex roof with bespoke hip tiles.

 

Jan 2021 - strip and re-cover

JAN 2021 - lead capping to re-tiled roof peak, bespoke hip tiles.

PROJECTS IN PROGRESS 2020

NOV 2020 - plots 1 and 2  under construction at Lenwade.

NOV 2020- works to eight local estate houses, fascias, guttering eaves repairs and some complete re-roof works.

September 2020 - strip and re-slate - front elevation view, Sunny Hunny, Norfolk.

September 2020 - scaffold up for some roof repairs on a listed property - North Norfolk

September 2020 - plot 1 and 2 under construction - Lenwade, Norfolk.

September 2020 - plot 3,4 and 5 under construction - Lenwade, Norfolk

August 2020 - scaffold up for chimney repairs and flue liner installation - Mid Norfok.

September 2020 - Lenwade, Norfolk, plot 8 & 9 FOR SALE

Feb 2020 - Whitsands Road, plot 6 & 7 completed, plot 8 being second fixed.

PROJECTS IN PROGRESS 2019

Nov 2019- Whitsands Road - plots 1,2,3,4 & 5 all finished and all rented our for our clients, plot 6 nearly ready for decoration, plot 7 and 8, 2nd fixing shortly.

Nov 2019 - Lenwade - plot 8 & 9 with external UPVC installed and ready for the external K-Rend finish on plot 9.

Sept 2019 - replacement Oak balcony with glass balustrading.

Aug 2019 - Lenwade, Street Works complete, groundorks progressing well.

July 2019 - Rear elevation garden room with corner support and window. French doors will open onto terrace and hot tub area!

Plot 1 and 2 handed over today and ready for rental. - June 2019

June 2019 - groundworks under way on Lenwade development.

June 2019- scaffold erected in local town ready for redcoration and repairs.

March 2019 - replacement shop front being manufactured in local precinct - temporary boarding in place.

March 2019 - site peperation under way - development 

Norfolk

March 2019 - front canopy to match client's car port - Swaffham

Feb 2019 - plot 1,2 (brick facade), 3 and 4 (render facade) rear view - Swaffham.

Scaffold up on plots 5+6.

Feb 2019 - plot 7+8 Swaffham, render under way

PROJECTS IN PROGRESS 2018

Nov 2018 - Concrete and drainage repairs, Dereham Nelson Place shopping centre.

Nov 2018 - plot 7+8 under construction

Nov 2018 - plot 3+4 all roofed, lock and key, scaffold adapted and ready for the K Rend.

Oct 2018 - replacement glazing, lead detail, replacement reclaimed ridge and swallow inserts.

Sept. 2018 plot 1+2 under lock and key, with 3+4 well under way.

Aug 2018 - Chaelt refurbishment with walls demolished, made good, new kitchen, bathroom, cloakroom, electrics and plumbing.

Aug 2018 - 1+2 being covered in, 3+4 ready for scaffolding.

July 2018 - plot 1+2 under construction, Swaffham.

June 2018 - Scaffoldup in Kings Lynn for repairs to joinery, replacement windows and external redecoration.

June 2018 - Flats in Norwich completed and already rented out by the client.

June 2018 - new development, Swaffham, Norfolk.

First dwellings laoded out and ready to lay some bricks.

April 2018 - Bungalow refurbishment and extension - Swaffham.

Mar 2018- Wc refurbishment & disabled facilities - Melre Boddy Centre, Swaffham,Norfolk.

Mar 2018 - front elevation showing infill flats - Norwich, Norfolk

Feb 2018 - nice overhead shot of the groundworks in Swaffham

Jan 2018 - flats, Norwich, Norfolk

Jan 2018 - setting up site New Dwellings, Swaffham, Norfolk.

New Development - Swaffham, Norfolk.

Jan 2018 - front elevation on dispplay with lighting, decorators on site

PROJECTS IN PROGRESS 2017

Dec 2017 - front elevation new build - Norfolk

Dec 2017 - internal view lantern in Orangery attached to new build house - Norfolk.

Dec 2017 -infill site to provide two flats - Norwich, Norfolk.

Oct 2017 - rear scaffold down from Orangey, time for the frames and glass to be fitted.

Oct 2017 - Bespoke glazed lantern installed on Orangery to rear elevation new build - Norfolk.

Oct 2017- external works under way, plastering finished and internal fixtures and fittings going in. Air Source Heat Pump up and running.

 

Sept 2017 - Valley repairs/replacement - Necton, Norfolk

Sept 2017 - groundworks complete, ready for construction of two flats - Norwich, Norfolk.

Aug 2017 - new build, scaffollding down, plastering underway - Norfolk

Aug 2017 - garage conversion and rear extension, all to Building Regulation approval and inspections - Necton, Norfolk

Aug 2017 - Village Hall WC refurbishment with disabled facilities. - Norfolk

June 2017 - joists and decking fitted to first floor, scaffold up and cavity walling being constructed - Sporle, Norfolk.

June 2017- replacement rendering, with movement joints, decoration and redecoration works - Necton

June 2017- Partial strip & re-tile to local village hall - Norfolk 

May 2017- strip, reslate, replacment stacks, timber repairs and replacement gutters - Norwich

May 2017 - Kitchen and internal alterations - Norfolk

April 2017 - scaffold up and getting ready for the engineered joists - Norfolk

Feb 2017- house foundations being poured.